您的位置: 首页 >典型业绩>水利水运>水运工程>详细内容

崔家营航电枢纽

来源: 发布时间:2014-08-12 15:17:41 浏览次数: 【字体:

 

b142f8b745724b93aa37a821fb09e72e.jpg

    崔家营航电枢纽工程位于湖北省襄樊市境内汉江中游,是一个以航运为主,兼顾发电、灌溉、供水、旅游等综合效益的大(2)型水运工程。2004年开工,2009年建成。船闸过船吨位为1000t,年单向通过能力为768万t/a。土石坝,坝高13.5m。低水头径流式电站,河床式厂房,装机容量90MW(6*15MW)。灯泡贯流式水轮发电机组,水轮机转轮直径6.8m,最大水头8.08m,额定水头5.5m,最小水头1.5m。

 

Cuijiaying Navigation & Power Complex 

Cuijiaying Navigation & Power Complex, which is located at the middle reach of Hanjiang River in Xiangfan City of Hubei Province. It is a Grade II large-scale hydropower station possessing comprehensive utilization benefits mainly for navigation, incorporated with power generation, irrigation, water supply and tourism. Construction of the Project started in 2004 and accomplished in 2009. The ship passing tonnage of the lock is 1,000t and the annual passing capacity for single direction is 7.68 million t/year. It adopts earth-rock dam with dam height of 13.5m. It built with low head runoff power station, powerhouse on riverbed, with installed capacity of 90MW (6×15MW). It adopts bulb type tubular turbine generator unit, with maximum head of 8.08m, rated head of 5.5m, minimum head of 1.5m and turbine runner diameter of 6.8m, with max. head of 8.08m, rated head of 5.5m, min. head of 1.5m. 

 

航电枢纽
【打印正文】
分享到:
×

用户登录